Concrete calculator for Georgia

Cubic yards, bag counts and delivered cost using Georgia ready-mix and finishing labor rates, with local frost depth applied to footing and post-hole guidance.

  • No email required
  • No phone number
  • No contractor calls
Project

Length × Width × Thickness

ft
ft
in
Supply

Affects ready-mix and labor, not bag prices

Turn off for a materials-only takeoff

Concrete needed

5.43yd³

146.7 ft³ including a 10% waste allowance · 133.3 ft³ geometric volume

40lb bags
489
60lb bags
326
80lb bags
245

Bags vs ready-mix

Cost comparison between bagged concrete and ready-mix
245 × 80lb bagsMixed on site, no delivery window$1,593
5.43 yd³ ready-mix$155/yd³ delivered$842
Placing & finishing labor400 sq ft at 0.85× national rates$1,194

Order ready-mix. At 5.43 yd³ you would be mixing 245 bags by hand. A full day of work before any finishing happens, with real risk of inconsistent strength between batches.

Example concrete projects in Georgia

Ready-mix and labor adjusted by the Georgia multiplier of 0.85×. Bagged concrete is priced nationally and does not vary by state.

10 × 10 slab in Georgia

4 in thick, shed pad or small patio

$244 to $702

1.36 yd³ · 62 × 80 lb bags

12 post holes in Georgia

10 in diameter, set to 3 ft for local frost depth

$153 to $202

0.68 yd³ · 31 × 80 lb bags

40 × 12 driveway in Georgia

5 in thick at vehicle-load thickness

$1,077 to $3,819

8.15 yd³ · 367 × 80 lb bags

Concrete prices in Georgia

How local rates compare against the national average.

ItemGeorgiaNational averageDifference
Ready-mix per cubic yard$132$155-$23
Finishing labor per sq ft$2.99$3.50-$0.51
80 lb bag$6.50$6.50No change
Minimum footing depth6 inVaries by stateWell below average

Bagged concrete is a nationally distributed product and its price barely moves between states. Ready-mix and labor are local, which is why only those lines carry the multiplier.

Concrete calculators by project type

ProjectTypical size
Concrete Slab20 length, 20 width, 4 thickness
Post Hole Concrete10 diameter, 3 depth, 12 quantity
Concrete Footing20 length, 1.5 width, 12 thickness, 1 quantity
Concrete Driveway40 length, 12 width, 5 thickness
Concrete Patio16 length, 12 width, 4 thickness

How much does concrete cost in Georgia?

Ready-mix delivered in Georgia runs roughly $132 per cubic yard, against a national average of $155. Orders under 5 cubic yards usually carry a short-load fee of about $75 on top, which is why a small pour costs more per yard than a large one.

Placing and finishing labor here runs about $2.99 per square foot for flatwork, reflecting a construction labor market about 15% below the national average. That covers screeding, floating, edging and jointing. The finishing is what separates a slab that lasts thirty years from one that crazes and spalls in five, and it is the half of the bill that moves when you change states.

Bagged concrete does not move. It is a nationally distributed product priced at about $6.50 for an 80 lb bag anywhere in the country, so the state multiplier in this concrete calculator applies to ready-mix and labor only. Bought that way, a cubic yard costs $293, close to double the delivered rate in Georgia.

What a concrete slab costs in Georgia

The size most people arrive with is 20 × 20. At 4 inches thick that is 5.43 cubic yards including the 10% waste allowance, which in Georgia works out to about $718 of delivered concrete plus $1,194 in placing and finishing labor, roughly $1,912, or $4.78 per square foot.

Scaling up and down from there: a 10 × 10 shed pad takes 1.36 yards and is the largest slab most people should attempt to pour themselves, while a 30 × 40 garage floor takes 16.30 yards and comes to around $5,737 in Georgia before base preparation. Note that the per-square-foot figure barely moves between them. Concrete is one of the few trades where there is little economy of scale, because the material is the material.

None of those figures include a gravel base, forms, reinforcement, excavation or grading. The base is the one worth budgeting for immediately: 4.94 cubic yards of crushed stone under that 20 × 20 slab costs $200 to $600 installed, and it does more to prevent cracking than any other money you can spend.

Bags or ready-mix in Georgia?

Volume decides this, not price. Bags are always the dearer way to buy concrete. Below roughly 2 cubic yards they win on convenience: no delivery window to meet, no short-load fee, and you mix at your own pace over a weekend. The 1.36-yard shed pad above sits comfortably inside that, at 62 eighty-pound bags.

Above it the labor becomes the problem rather than the cost: at 2 cubic yards you are mixing 90 eighty-pound bags, and batches mixed at slightly different consistencies cure to different strengths. A truck arrives uniformly mixed and is placed in one go, with no cold joints where one batch met the next.

Set the state to Georgia in the bag concrete calculator above and both routes are priced side by side for whatever you are pouring, with the local ready-mix and labor rates applied and the bag prices left national.

Site preparation and frost depth in Georgia

Georgia has a shallow 6-inch frost depth, which keeps post setting quick and cheap. Anything carrying load, a footing, a deck pier, a fence post, has to bear below that line, because a footing that stops short of it will heave and heave cracks whatever sits on top. A 12-inch column form taken to 12 inches holds 0.8 cubic feet on its own, which is how frost depth turns into a concrete order.

Ground conditions here are the well-known Georgia red clay, sticky when wet, brick-hard when dry. That affects both how hard the excavation is and how much base a slab needs underneath it, 4 inches of compacted gravel is the standard specification and 6 inches the usual answer over clay or poorly draining subgrade, at $30 to $50 per delivered cubic yard.

Red clay is moderately expansive. A compacted gravel base under slabs prevents most cracking complaints. The climate here is humid subtropical with long hot summers and short mild winters, and concrete is sensitive at both temperature extremes: below about 40°F it gains strength too slowly and needs blankets or a heated enclosure, and above about 90°F it can flash-set and crust before it has been properly finished.

How we calculated these estimates

Every figure on this page comes from the same open formula the calculator above uses. Volume is pure geometry, the shape's formula worked in feet, plus a 10% waste allowance. Prices start from 2026 national baselines: $155 per cubic yard delivered, a $75 short-load fee under 5 yards, retail bag prices against the yields QUIKRETE and Sakrete publish, and $3.50 per square foot for placing and finishing flatwork. Ready-mix and labor are then scaled by the construction earnings multiplier the Bureau of Labor Statistics publishes for your state; bagged concrete is not, because it is priced nationally. Nothing is hidden behind a lead form and no supplier pays to appear here. What the result is not is a quote: excavation, base preparation, forms, reinforcement, permits and demolition are excluded, and a plant will price your delivery distance and mix specification on top.

Concrete FAQs for Georgia

How much is a yard of concrete in Georgia?

Ready-mix delivered in Georgia runs about $132 per cubic yard against a national average of $155, reflecting a local construction labor market at 0.85× the national rate. Orders under 5 cubic yards add a short-load fee near $75. As of July 2026, ready-mix prices sit about 9% above their five-year average on the Producer Price Index, so a quote you were given a couple of years ago understates what a plant charges today. Bagged concrete is priced nationally and barely varies by state. An 80 lb bag is about $6.50 anywhere in the country, which works out to $293 per cubic yard.

How much should a 20x20 concrete slab cost in Georgia?

A 20 × 20 slab is 400 square feet and needs 5.43 cubic yards at 4 inches thick including waste. In Georgia that is roughly $718 in delivered ready-mix plus about $1,194 in placing and finishing labor, around $1,912 all in, or $4.78 per square foot. Add $200 to $600 for a compacted gravel base, plus forms, reinforcement and any grading. Pouring it yourself removes the labor line entirely and leaves the $718 of concrete.

How much does a 30x40 concrete slab cost in Georgia?

A 30 × 40 slab at 4 inches thick is 1,200 square feet and takes 16.30 cubic yards including the 10% waste allowance. In Georgia that is about $2,155 of delivered concrete and roughly $3,583 in placing and finishing labor, for a total near $5,737 before base preparation and reinforcement. At this volume bags are not a serious option. It would take 734 eighty-pound bags, about 29 tons of material.

Is it cheaper to pour your own concrete slab in Georgia?

Cheaper, yes. The question is whether the slab is small enough. Placing and finishing labor in Georgia runs about $2.99 per square foot, which on a 20 × 20 slab is $1,194 of a roughly $1,912 project. Doing it yourself leaves $718 of ready-mix, or $1,593 if you buy 245 eighty-pound bags instead. Below about 2 cubic yards, a shed pad like the 10 × 10 above, at 1.36 yards, that is a realistic weekend. Above it you are racing the set time rather than the budget, and that is the point at which hiring a crew stops being optional.

Do I need gravel under a concrete slab in Georgia?

Yes, and in Georgia the reason is specific: ground conditions here are the well-known Georgia red clay, sticky when wet, brick-hard when dry. A 4-inch compacted gravel base under a slab gives uniform bearing, breaks the capillary path that wicks groundwater into the concrete, and gives water a route out. Where the subgrade is clay or drains poorly, 6 inches is the usual specification. On a 20 × 20 slab that is 4.94 cubic yards of crushed stone, or $200 to $600 installed at $0.50-$1.50 per square foot.

How deep do footings need to be in Georgia?

Georgia has a typical frost depth of 6 inches, and any footing carrying load has to bear below that line so a freeze cannot lift it. At that depth the frost line is rarely what governs. Footing size here is set by bearing capacity and local practice instead, so confirm the requirement with your building department, which sets it county by county rather than statewide. Deck piers are the most common reason a homeowner pours footings, and our deck calculator prices the structure they carry.

Should I use bags or ready-mix in Georgia?

Volume decides it, not price. Bags are always the dearer way to buy concrete. Below roughly 2 cubic yards bags win on convenience: no delivery window, no short-load fee, and you mix at your own pace. Above that, mixing becomes the problem rather than the cost, because 2 yards is 90 eighty-pound bags and batches mixed at different consistencies cure to different strengths. Ready-mix in Georgia costs around $132 per yard delivered against $293 a yard in bags.

When is the best time to pour concrete in Georgia?

Red clay is moderately expansive. A compacted gravel base under slabs prevents most cracking complaints. The climate here is humid subtropical with long hot summers and short mild winters, and concrete is sensitive at both temperature extremes: below about 40°F it gains strength too slowly and needs blankets or a heated enclosure, and above about 90°F it can flash-set and crust before it has been properly finished. Aim for a mild, still, overcast day and start early; wind and direct sun pull water out of the surface faster than heat alone does.

Concrete cost in other states

The figure beside each state is its construction labor multiplier relative to the national average of 1.00×.

Our estimates are backed by real data

Every figure on this page traces back to a published source. Where a government dataset is available, we fetch it at build time rather than typing in a number and hoping it stays true.

Labor rates
US Bureau of Labor Statistics, Current Employment Statistics, construction average hourly earnings by state, July 2026. National average $41.46/hr. Source
Material cost trends
Federal Reserve Economic Data (FRED), Producer Price Index, ready-mix concrete, iron & steel, concrete products, July 2026. Source
Concrete yields
QUIKRETE and Sakrete published product specifications, cubic feet of finished concrete per bag. Source
Frost depths
State and county building-code minimum footing depths, compiled per state. Confirm locally before excavating. Source

Data last updated: August 17, 2026